‹All pads
All pads

Howell 33 SMF JF

Ascent ResourcesSmithfield Twp.Jefferson CountyOH
Approved route map (PDF)
Wells on this pad9›
  • HOWELL 33 NW SMF JF 1HAPI 34-081-2-0833
  • HOWELL 33 SW SMF JF 2HAPI 34-081-2-0870
  • HOWELL 33 NW SMF JF 3HAPI 34-081-2-0834
  • HOWELL 33 SW SMF JF 4HAPI 34-081-2-0871
  • HOWELL 33 NE SMF JF 5HAPI 34-081-2-0835
  • HOWELL 33 S SMF JF 6HAPI 34-081-2-0872
  • HOWELL 33 NE SMF JF 7HAPI 34-081-2-0836
  • HOWELL 33 SE SMF JF 8HAPI 34-081-2-0873
  • HOWELL 33 SE SMF JF 10HAPI 34-081-2-0874

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

8 road alerts within 15 mi

  • SR-151 West W10.4 miAll lanes are closed on SR-151 West at Snyder Rd, due to a crash.. [object Object]
  • SR-151 East E10.7 miAll lanes are closed on SR-151 East at Mcafee Rd, due to a crash.. [object Object]
  • Ramp Closure for State Route 7 northbound northbound11.6 miThe ramp is closed due to a slope failure at this location. Construction is estimated to begin in the spring of 2026 and be completed in the fall of 2026. Detour: From 2025-07-11 to 2026-10-31, between 12:00 AM and 11:59 PM, RAMP FROM SR 7N TO TR 167A COOL SPRING RD TO SR 7 TO COOL SPRING RD TO COMMERCIAL ST TO RAMP FROM CR 7B COMMERCIAL ST TO SR 7 TO COMMERCIAL ST
  • EXIT 219 CLOSURE (for Cadiz/SR 9 north/U.S. 250 east) eastbound11.6 mi90-day ramp closure. Detour: Continue east on U.S. 22 to EXIT 224 (SR 151 west), take EXIT 224 to SR 151 east, SR 151 east to U.S. 22 west, continue west on U.S. 22 to return to EXIT 219 (Cadiz/U.S. 250 east/SR 9 north). Detour: From 2026-08-10 to 2026-11-08, between 12:00 AM and 11:59 PM, Continue east on U.S. 22 to SR 151 west, SR 151 west (EXIT 224) to U.S. 22 west, U.S. 22 west back to U.S. 250/SR 9 (EXIT 219).
  • State Route 7 Lane Closures for Resurfacing southbound11.7 miOne lane of traffic is maintained throughout construction. The completion date is October 31, 2026.
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions11.9 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions12.0 mi

Site info

Nearest hospitalCadiz Medical Building, 45167 Cadiz Harrisville Rd, Cadiz, Ohio, 43907

Pad Coordinates

40.23371, -80.78732
NavigateDispatch
The removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • State Route 9 between Toot Rd. and Upper Clearfork Rd. northbound12.2 miSlide repair project. One lane of traffic is maintained with temporary traffic signals and an 11-foot width restriction.
  • Live from OHGO. Updated continuously.