‹All pads
All pads

Clearwater One FWI

Ascent ResourcesMoorefield Twp.Harrison CountyOH
Approved route map (PDF)
Wells on this pad2›
  • DAVIDSON 1-36HAPI 34-067-2-1278
  • DAVIDSON 2-36HAPI 34-067-2-1279

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

Approximate location

This pin is close but not exact. Follow the written route below for the last stretch, and call dispatch if anything looks off.

7 road alerts within 15 mi

  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions11.9 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions11.9 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • State Route 9 between Toot Rd. and Upper Clearfork Rd. northbound12.3 miSlide repair project. One lane of traffic is maintained with temporary traffic signals and an 11-foot width restriction.
  • EXIT 219 CLOSURE (for Cadiz/SR 9 north/U.S. 250 east) eastbound12.3 mi90-day ramp closure. Detour: Continue east on U.S. 22 to EXIT 224 (SR 151 west), take EXIT 224 to SR 151 east, SR 151 east to U.S. 22 west, continue west on U.S. 22 to return to EXIT 219 (Cadiz/U.S. 250 east/SR 9 north). Detour: From 2026-08-10 to 2026-11-08, between 12:00 AM and 11:59 PM, Continue east on U.S. 22 to SR 151 west, SR 151 west (EXIT 224) to U.S. 22 west, U.S. 22 west back to U.S. 250/SR 9 (EXIT 219).
  • I-70 Eastbound at EXIT 208 eastbound12.7 miLane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
  • U.S. Route 40 Resurfacing eastbound12.7 miTraffic is maintained with flaggers throughout construction.
  • State Route 151 from U.S. 250 to Bowerston eastbound14.6 miResurfacing nearly five miles of State Route 151 from U.S. Route 250 to Bowerston. Traffic is maintained with flaggers throughout the project period.

Live from OHGO. Updated continuously.

Route

From the North (Uhrichsville, OH):

  1. Follow OH-800 S/Johnson Ave.(19.4 mi)
  2. Turn left onto US-22 E(2.5 mi)
  3. Turn right onto Fair Rd. ending at the Clearwater One entrance.(400 ft)

From the West (Cambridge, OH):

  1. Follow US-22 E(25.8 mi)
  2. Turn right onto Fair Rd. ending at the Clearwater One entrance.(400 ft)

From the East (St. Clairsville, OH):

  1. Follow I-70 W(12.1 mi)
  2. Take exit 202 for OH-800 N and follow(11.8 mi)
  3. Turn right onto US-22 E and follow(3.1 mi)
  4. Turn right onto Fair Rd. ending at the Clearwater One entrance.(400 ft)

Site info

Nearest hospitalHarrison Community Hospital, 951 E Market St, Cadiz, Ohio, 43907

Pad Coordinates (approximate)

40.20218, -81.204292
Navigate (approx.)Dispatch