‹All pads
All pads

JEFFREY 2-15-5 PAD

EOG ResourcesOH
EOG Good Catch
Wells on this pad2›
  • HAWK 2-15-5 1HAPI 34-019-2-2247
  • HAWK 2-15-5 8HAPI 34-019-2-2220

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

8 road alerts within 15 mi

  • State Route 644 Culvert Replacement northbound4.2 miDuring construction, traffic will be maintained with temporary traffic signals with a 10-foot width restriction.
  • US 30 resurfacing Canton, East Canton & Minerva westbound5.8 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing. • US30 from Trump Avenue to the East Canton eastern corporation limit. • SR172 from N Cedar Street to Browning Court • US 30 from Liberty Avenue to the Columbiana County Line. Estimated completion, late October 2026.
  • US 30 resurfacing Canton, East Canton & Minerva eastbound5.8 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing. • US30 from Trump Avenue to the East Canton eastern corporation limit. • SR172 from N Cedar Street to Browning Court • US 30 from Liberty Avenue to the Columbiana County Line. Estimated completion, late October 2026.
  • Grant Boulevard bridge in Minerva eastbound6.0 miThe road is closed for the replacement of the Grant Boulevard bridge over Sandy Creek. Detour: From 2026-07-06 to 2026-10-31, between 12:00 AM and 11:59 PM, SR183 to Line St to Murray Ave
  • State Route 164 Chip Sealing Preventative Maintenance Project northbound11.3 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
  • State Route 164 through Lisbon northbound12.2 miNighttime resurfacing work. Traffic is maintained with flaggers throughout the construction period.
  • State Route 164 Chip Sealing Preventative Maintenance Project northbound12.6 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
  • State Route 164 Chip Sealing Preventative Maintenance Project northbound13.6 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.

Live from OHGO. Updated continuously.

Site info

Nearest hospitalHanoverton Health and Services, 10251 Plymouth St, Hanoverton, Ohio, 44423

Pad Coordinates

40.72356, -80.98999
NavigateDispatch