Maximum legal haul in OH. Check your truck's axle count and tank size before loading.
5 road alerts within 15 mi
State Route 265 Resurfacing eastbound11.8 miState Route 265 will experience lane closures under a flagging operation for resurfacing work between U.S. Route 40 and SR 285 beginning Tuesday, Sept. 8. Estimated completion: November 2026
I-70 Eastbound at EXIT 208 eastbound12.8 miLane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
U.S. Route 40 Resurfacing eastbound13.6 miTraffic is maintained with flaggers throughout construction.
Interstate 77 Northbound both directions14.1 miThe I-77 left inside lanes are closed to traffic in both directions.
Interstate 77 Southbound both directions14.1 miThe I-77 left inside lanes are closed to traffic in both directions.
Live from OHGO. Updated continuously.
Address
90 Travel approximately 1.7 miles on CR 690. Turn left on CR 94