‹All pads
All pads

LEHWALD CL BUT PAD

EOG ResourcesButler Twp.Columbiana County CountyOH
EOG Good Catch
Wells on this pad4›
  • Lehwald CL BUT 1HAPI 34-029-2-1999
  • Lehwald CL BUT 3HAPI 34-029-2-2000
  • Lehwald CL BUT 5HAPI 34-029-2-2001
  • Lehwald CL BUT 205HAPI 34-029-2-2002

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

6 road alerts within 15 mi

  • State Route 644 Culvert Replacement northbound9.4 miDuring construction, traffic will be maintained with temporary traffic signals with a 10-foot width restriction.
  • US 30 resurfacing Canton, East Canton & Minerva westbound10.1 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing. • US30 from Trump Avenue to the East Canton eastern corporation limit. • SR172 from N Cedar Street to Browning Court • US 30 from Liberty Avenue to the Columbiana County Line. Estimated completion, late October 2026.
  • US 30 resurfacing Canton, East Canton & Minerva eastbound10.1 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing. • US30 from Trump Avenue to the East Canton eastern corporation limit. • SR172 from N Cedar Street to Browning Court • US 30 from Liberty Avenue to the Columbiana County Line. Estimated completion, late October 2026.
  • Grant Boulevard bridge in Minerva eastbound10.7 miThe road is closed for the replacement of the Grant Boulevard bridge over Sandy Creek. Detour: From 2026-07-06 to 2026-10-31, between 12:00 AM and 11:59 PM, SR183 to Line St to Murray Ave
  • State Route 164 through Lisbon northbound11.8 miNighttime resurfacing work. Traffic is maintained with flaggers throughout the construction period.
  • U.S. Route 224 & State Route 534 resurfacing, Berlin & Milton Townships eastbound12.5 miThe following routes have various lane restrictions for pavement repairs and resurfacing: • U.S. 224 between the Portage County line to SR 534. • SR 534 from U.S. 224 to the Trumbull County line. Estimated completion, mid-September 2026.

Live from OHGO. Updated continuously.

Site info

Nearest hospitalHanoverton Health and Services, 10251 Plymouth St, Hanoverton, Ohio, 44423

Pad Coordinates

40.84348, -80.9756
NavigateDispatch