‹All pads
All pads

Archie WYN JF

Ascent ResourcesJefferson CountyOH
Approved route map (PDF)
Wells on this pad8›
  • Archie NW WYN JF 1HAPI 34-081-2-1030
  • ARCHIE W WYN JF 2HAPI 34-081-2-0827
  • Archie N WYN JF 3HAPI 34-081-2-1031
  • ARCHIE W WYN JF 4HAPI 34-081-2-0826
  • Archie C WYN JF 5HAPI 34-081-2-1032
  • ARCHIE E WYN JF 6HAPI 34-081-2-0828
  • Archie NE WYN JF 7HAPI 34-081-2-1033
  • ARCHIE E WYN JF 8HAPI 34-081-2-0829

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

8 road alerts within 15 mi

  • SR-151 West W6.6 miAll lanes are closed on SR-151 West at Snyder Rd, due to a crash.. [object Object]
  • SR-151 East E6.8 miAll lanes are closed on SR-151 East at Mcafee Rd, due to a crash.. [object Object]
  • State Route 646 from SR 9 in Germano to CR 39 in Annapolis northbound7.1 miSpot paving work along SR 646, traffic is maintained with flaggers.
  • EXIT 219 CLOSURE (for Cadiz/SR 9 north/U.S. 250 east) eastbound10.2 mi90-day ramp closure. Detour: Continue east on U.S. 22 to EXIT 224 (SR 151 west), take EXIT 224 to SR 151 east, SR 151 east to U.S. 22 west, continue west on U.S. 22 to return to EXIT 219 (Cadiz/U.S. 250 east/SR 9 north). Detour: From 2026-08-10 to 2026-11-08, between 12:00 AM and 11:59 PM, Continue east on U.S. 22 to SR 151 west, SR 151 west (EXIT 224) to U.S. 22 west, U.S. 22 west back to U.S. 250/SR 9 (EXIT 219).
  • State Route 9 between Toot Rd. and Upper Clearfork Rd. northbound10.3 miSlide repair project. One lane of traffic is maintained with temporary traffic signals and an 11-foot width restriction.
  • State Route 213 from State Route 7 to State Route 152 northbound10.5 miResurfacing work, one lane of traffic will be maintained with flaggers.
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions10.6 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • State Route 7 Lane Closures for Resurfacing southbound

Address

292 Tr 139, Bloomingdale, OH 43910

Route

3/18/2019 125 E Steubenville St, Bloomingdale, OH 43910 -> 292 Tr 139, Bloomingdale, OH 43910 - Google Maps 125 E Steub

Site info

Nearest hospitalTrinity Express Care - Wintersville, 150 Main St, Steubenville, Ohio, 43953

Pad Coordinates

40.338273, -80.817002
NavigateDispatch
10.6 mi
One lane of traffic is maintained throughout construction. The completion date is October 31, 2026.

Live from OHGO. Updated continuously.