Maximum legal haul in OH. Check your truck's axle count and tank size before loading.
8 road alerts within 15 mi
State Route 164 Chip Sealing Preventative Maintenance Project northbound7.4 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
State Route 164 Chip Sealing Preventative Maintenance Project northbound8.5 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
State Route 646 from SR 9 in Germano to CR 39 in Annapolis northbound10.4 miSpot paving work along SR 646, traffic is maintained with flaggers.
State Route 164 Chip Sealing Preventative Maintenance Project northbound11.0 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
State Route 151 from U.S. 250 to Bowerston eastbound13.4 miResurfacing nearly five miles of State Route 151 from U.S. Route 250 to Bowerston.
Traffic is maintained with flaggers throughout the project period.
Grant Boulevard bridge in Minerva eastbound13.7 miThe road is closed for the replacement of the Grant Boulevard bridge over Sandy Creek.
Detour: From 2026-07-06 to 2026-10-31, between 12:00 AM and 11:59 PM, SR183 to Line St to Murray Ave
State Route 644 Culvert Replacement northbound14.0 miDuring construction, traffic will be maintained with temporary traffic signals with a 10-foot width restriction.
US 30 resurfacing Canton, East Canton & Minerva eastbound14.1 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing.
• US30 from Trump Avenue to the East Canton eastern corporation limit.
• SR172 from N Cedar Street to Browning Court
• US 30 from Liberty Avenue to the Columbiana County Line.
Estimated completion, late October 2026.