‹All pads
All pads

ACTON 23-7-2 PAD

EOG ResourcesIsland Creek Twp.Jefferson County CountyOH
EOG Good Catch
Wells on this pad3›
  • ACTON 23-7-2 1HAPI 34-081-2-0669
  • ACTON 23-7-2 6HAPI 34-081-2-0667
  • ACTON 23-7-2 9HAPI 34-081-2-0668

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

8 road alerts within 15 mi

  • State Route 213 from State Route 7 to State Route 152 northbound2.4 miResurfacing work, one lane of traffic will be maintained with flaggers.
  • State Route 7 Northbound Slide Repair northbound5.7 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
  • State Route 7 Northbound Slide Repair northbound5.7 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
  • 4th Street Ramp for State Route 7 Southbound southbound5.8 miThe southbound ramp for SR 7 at this location is closed for work relating to a slide repair project near this location. The detour for the ramp is to take Old State Route 7 north to SR 152, then turn south onto SR 7.
  • WVDOT Bridge Repair Project: Veterans Memorial Bridge (U.S. 22) eastbound7.0 miWVDOT bridge repair project. One lane of traffic is maintained throughout construction. Expect possible delays.
  • State Route 7 Lane Closures for Resurfacing southbound8.7 miOne lane of traffic is maintained throughout construction. The completion date is October 31, 2026.
  • Reese Street northbound8.8 miThe road is closed for a bridge replacement project. Estimated completion is October 31, 2026.
  • Ramp Closure for State Route 7 northbound northbound9.9 miThe ramp is closed due to a slope failure at this location. Construction is estimated to begin in the spring of 2026 and be completed in the fall of 2026. Detour: From 2025-07-11 to 2026-10-31, between 12:00 AM and 11:59 PM, RAMP FROM SR 7N TO TR 167A COOL SPRING RD TO SR 7 TO COOL SPRING RD TO COMMERCIAL ST TO RAMP FROM CR 7B COMMERCIAL ST TO SR 7 TO COMMERCIAL ST

Live from OHGO. Updated continuously.

Site info

Nearest hospitalTrinity Expressclinic - Toronto, 1800 Franklin St, Toronto, Ohio, 43964

Pad Coordinates

40.44612, -80.70881
NavigateDispatch