‹All pads
All pads

Blayney WHL BL

Ascent ResourcesWheeling Twp.Belmont CountyOH
Approved route map (PDF)
Wells on this pad6›
  • BLAYNEY W WHL BL 1H-AAPI 34-013-2-1297
  • Blayney SW WHL BL 2HAPI 34-013-2-1510
  • BLAYNEY N WHL BL 3HAPI 34-013-2-0968
  • Blayney S WHL BL 4HAPI 34-013-2-1503
  • BLAYNEY E WHL BL 5H-AAPI 34-013-2-1298
  • Blayney SE WHL BL 6HAPI 34-013-2-1504

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

8 road alerts within 15 mi

  • U.S. Route 40 Resurfacing eastbound4.0 miTraffic is maintained with flaggers throughout construction.
  • I-70 Eastbound at EXIT 208 eastbound5.0 miLane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
  • State Route 149 0.5 miles west of Country Club Road (CR 56) eastbound6.5 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse. Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
  • State Route 149 0.5 miles west of Country Club Road (CR 56) westbound6.5 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse. Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
  • State Route 149 between Echo Road and School Street eastbound11.0 miBridge rehabilitation project. One lane of traffic maintained throughout construction.
  • State Route 147 from Wegee Road to Tiber Road northbound11.4 miSlide repair. Traffic is maintained with temporary traffic signals
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions11.5 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.

Route

From I-70:

  1. Take I-70 to exit 213 for OH-331 N.
  2. Turn onto OH-331 N(2.5 mi)
  3. Turn left onto C.R. 10 ending at the Blayney entrance.(0.8 mi)

From the North (Cadiz, OH):

  1. Take OH-9 S and continue onto OH-149 S(3.1 mi)
  2. Turn left onto OH-331 S(4.8 mi)
  3. Turn right onto Lafferty-Bannock/C.R. 10 ending at the Blayney entrance.(0.8 mi)

Site info

Nearest hospitalCadiz Medical Building, 45167 Cadiz Harrisville Rd, Cadiz, Ohio, 43907

Pad Coordinates

40.11563, -80.99263
NavigateDispatch
U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions11.6 mi
The removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.

Live from OHGO. Updated continuously.