Maximum legal haul in OH. Check your truck's axle count and tank size before loading.
8 road alerts within 15 mi
U.S. Route 40 Resurfacing eastbound2.6 miTraffic is maintained with flaggers throughout construction.
I-70 Eastbound at EXIT 208 eastbound3.6 miLane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
State Route 149 0.5 miles west of Country Club Road (CR 56) eastbound6.7 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse.
Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
State Route 149 0.5 miles west of Country Club Road (CR 56) westbound6.7 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse.
Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
State Route 147 from Wegee Road to Tiber Road northbound11.7 miSlide repair. Traffic is maintained with temporary traffic signals
State Route 149 between Echo Road and School Street eastbound12.0 miBridge rehabilitation project. One lane of traffic maintained throughout construction.
U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions12.3 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions12.3 mi
The removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.