8 road alerts within 15 mi
- Reese Street northbound3.3 miThe road is closed for a bridge replacement project. Estimated completion is October 31, 2026.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound4.2 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 45 Chip Seal Project northbound4.6 miA project to chip and seal eight miles of SR 45, along with a section of SR 39. Traffic will be maintained with flaggers.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound6.7 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound8.3 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 644 Culvert Replacement northbound10.6 miDuring construction, traffic will be maintained with temporary traffic signals with a 10-foot width restriction.
- State Route 164 through Lisbon northbound11.2 miNighttime resurfacing work. Traffic is maintained with flaggers throughout the construction period.
- 4th Street Ramp for State Route 7 Southbound southbound12.7 miThe southbound ramp for SR 7 at this location is closed for work relating to a slide repair project near this location. The detour for the ramp is to take Old State Route 7 north to SR 152, then turn south onto SR 7.
Live from OHGO. Updated continuously.