8 road alerts within 15 mi
- State Route 7 Lane Closures for Resurfacing southbound2.8 miOne lane of traffic is maintained throughout construction. The completion date is October 31, 2026.
- WVDOT Bridge Repair Project: Veterans Memorial Bridge (U.S. 22) eastbound3.2 miWVDOT bridge repair project. One lane of traffic is maintained throughout construction. Expect possible delays.
- Ramp Closure for State Route 7 northbound northbound3.7 miThe ramp is closed due to a slope failure at this location. Construction is estimated to begin in the spring of 2026 and be completed in the fall of 2026.
Detour: From 2025-07-11 to 2026-10-31, between 12:00 AM and 11:59 PM, RAMP FROM SR 7N TO TR 167A COOL SPRING RD TO SR 7 TO COOL SPRING RD TO COMMERCIAL ST TO RAMP FROM CR 7B COMMERCIAL ST TO SR 7 TO COMMERCIAL ST
- State Route 213 from State Route 7 to State Route 152 northbound5.8 miResurfacing work, one lane of traffic will be maintained with flaggers.
- State Route 7 Northbound Slide Repair northbound8.8 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
- State Route 7 Northbound Slide Repair northbound8.8 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
- 4th Street Ramp for State Route 7 Southbound southbound9.0 miThe southbound ramp for SR 7 at this location is closed for work relating to a slide repair project near this location. The detour for the ramp is to take Old State Route 7 north to SR 152, then turn south onto SR 7.
- State Route 646 from SR 9 in Germano to CR 39 in Annapolis northbound13.5 miSpot paving work along SR 646, traffic is maintained with flaggers.
Live from OHGO. Updated continuously.