8 road alerts within 15 mi
- State Route 164 Chip Sealing Preventative Maintenance Project northbound4.8 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound5.5 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- Reese Street northbound7.0 miThe road is closed for a bridge replacement project. Estimated completion is October 31, 2026.
- State Route 646 from SR 9 in Germano to CR 39 in Annapolis northbound7.6 miSpot paving work along SR 646, traffic is maintained with flaggers.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound7.8 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 213 from State Route 7 to State Route 152 northbound9.2 miResurfacing work, one lane of traffic will be maintained with flaggers.
- 4th Street Ramp for State Route 7 Southbound southbound11.4 miThe southbound ramp for SR 7 at this location is closed for work relating to a slide repair project near this location. The detour for the ramp is to take Old State Route 7 north to SR 152, then turn south onto SR 7.
- State Route 7 Northbound Slide Repair northbound11.4 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
Live from OHGO. Updated continuously.