8 road alerts within 15 mi
- State Route 164 Chip Sealing Preventative Maintenance Project northbound6.5 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound7.4 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 164 Chip Sealing Preventative Maintenance Project northbound9.9 miOne lane of traffic is maintained with flaggers. The completion date is September 30, 2026.
- State Route 646 from SR 9 in Germano to CR 39 in Annapolis northbound10.6 miSpot paving work along SR 646, traffic is maintained with flaggers.
- State Route 644 Culvert Replacement northbound12.9 miDuring construction, traffic will be maintained with temporary traffic signals with a 10-foot width restriction.
- Grant Boulevard bridge in Minerva eastbound13.3 miThe road is closed for the replacement of the Grant Boulevard bridge over Sandy Creek.
Detour: From 2026-07-06 to 2026-10-31, between 12:00 AM and 11:59 PM, SR183 to Line St to Murray Ave
- US 30 resurfacing Canton, East Canton & Minerva eastbound13.7 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing.
• US30 from Trump Avenue to the East Canton eastern corporation limit.
• SR172 from N Cedar Street to Browning Court
• US 30 from Liberty Avenue to the Columbiana County Line.
Estimated completion, late October 2026.
- US 30 resurfacing Canton, East Canton & Minerva westbound13.7 miBeginning on Monday, March 2, the following routes will have various lane restrictions for curb ramp replacement and roadway resurfacing.
• US30 from Trump Avenue to the East Canton eastern corporation limit.
• SR172 from N Cedar Street to Browning Court
• US 30 from Liberty Avenue to the Columbiana County Line.
Estimated completion, late October 2026.
Live from OHGO. Updated continuously.