Maximum legal haul in OH. Check your truck's axle count and tank size before loading.
7 road alerts within 15 mi
Ramp Closure for State Route 7 northbound northbound2.8 miThe ramp is closed due to a slope failure at this location. Construction is estimated to begin in the spring of 2026 and be completed in the fall of 2026.
Detour: From 2025-07-11 to 2026-10-31, between 12:00 AM and 11:59 PM, RAMP FROM SR 7N TO TR 167A COOL SPRING RD TO SR 7 TO COOL SPRING RD TO COMMERCIAL ST TO RAMP FROM CR 7B COMMERCIAL ST TO SR 7 TO COMMERCIAL ST
State Route 7 Lane Closures for Resurfacing southbound3.2 miOne lane of traffic is maintained throughout construction. The completion date is October 31, 2026.
WVDOT Bridge Repair Project: Veterans Memorial Bridge (U.S. 22) eastbound5.3 miWVDOT bridge repair project. One lane of traffic is maintained throughout construction. Expect possible delays.
State Route 213 from State Route 7 to State Route 152 northbound9.1 miResurfacing work, one lane of traffic will be maintained with flaggers.
State Route 7 Northbound Slide Repair northbound11.7 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
State Route 7 Northbound Slide Repair northbound11.7 miSlide repair along the northbound lanes of State Route 7 located just south of the 4th Street EXIT ramp in Toronto. One lane of traffic is maintained.
4th Street Ramp for State Route 7 Southbound southbound11.9 miThe southbound ramp for SR 7 at this location is closed for work relating to a slide repair project near this location. The detour for the ramp is to take Old State Route 7 north to SR 152, then turn south onto SR 7.