‹All pads
All pads

Richland A

Ascent ResourcesRichland Twp.Belmont CountyOH
Approved route map (PDF)
Wells on this pad2›
  • COLEMAN RCH BL 1HAPI 34-013-2-1030
  • ROSS SE RCH BL 11HAPI 34-013-2-1031

Well and API data from Ohio DNR records.

Legal haul weights›
  • 5-axle (120 bbl tank)85 bbl
  • 7-axle (120 bbl tank)105 bbl
  • 7-axle (130 bbl tank)115 bbl
  • Tractor trailer130 bbl

Maximum legal haul in OH. Check your truck's axle count and tank size before loading.

Approximate location

This pin is close but not exact. Follow the written route below for the last stretch, and call dispatch if anything looks off.

8 road alerts within 15 mi

  • State Route 149 0.5 miles west of Country Club Road (CR 56) eastbound4.4 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse. Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
  • State Route 149 0.5 miles west of Country Club Road (CR 56) westbound4.4 miThe road is closed for a slide repair. The detour is SR 9 south to SR 147 west, SR 147 west back to SR 149, and reverse. Detour: From 2026-07-16 to 2026-08-15, between 12:00 AM and 11:59 PM, S JEFFERSON ST TO CENTERVILLE-WARNOCK RD
  • U.S. Route 40 Resurfacing eastbound5.9 miTraffic is maintained with flaggers throughout construction.
  • I-70 Eastbound at EXIT 208 eastbound6.9 miLane shifts for construction at the I-70/SR 149 (EXIT 208) interchange improvement project. Two lanes of traffic are maintained with a 12-foot width restriction.
  • State Route 149 between Echo Road and School Street eastbound7.2 miBridge rehabilitation project. One lane of traffic maintained throughout construction.
  • State Route 147 from Wegee Road to Tiber Road northbound8.4 miSlide repair. Traffic is maintained with temporary traffic signals
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions13.9 miThe removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.
  • U.S. 22 from just west of Cadiz to CR 13 (Upper Clearfork Rd) both directions

Live from OHGO. Updated continuously.

Route

From I-70:

  1. Follow I-70 toward exit 215 for US-40.
  2. Take exit 215 and head west on US-40 W.
  3. Turn right onto Vineyard Rd./C.R. 56 and follow ending at the Richland A entrance.(2.1 mi)

From the North (Flushing, OH):

  1. Head east on OH-331 S and follow(9.1 mi)
  2. Turn left onto US-40 E and follow(1.2 mi)
  3. Turn left onto Vineyard Rd./C.R. 56 and follow ending at the Richland A entrance.(2.1 mi)

Site info

Nearest hospitalWVU Medicine Ambulatory Surgery Center, 68 State Route 7, Bridgeport, Ohio, 43912

Pad Coordinates (approximate)

40.090317, -80.928132
Navigate (approx.)Dispatch
13.9 mi
The removal and replacement of pavement along the four-lane section of U.S. Route 22 from the two-lane section lcated west of Cadiz to just west of CR 13. One lane of traffic maintained in both directions throughout construction.